Scope of works: to install Electrical EV Infrastructure as per feasibility assessment:
EV Infrastructure inclusions:
LMS (Power Load Management)
Ocular LMS Control Module -Controls 1-50 chargers
- To wire and install 32-amp single-phase 7kw-ready EV charger circuits in each car park space. The circuits were wired from the main switch room and connected to each unit’s individual electrical meter. Each circuit was fitted with Type A RCD protection and an isolation switch in each car space, ready to connect the EV charger. All cable tray and mounting equipment was included. There were 20 units in total. Included a new distribution board for individual unit EV Charger RCBO Circuit Breakers
- Wired and installed Cat 6 Data links/control cables from the central switch room location to each car space x 20 for load management charger functions. Data and control cables were terminated in the switch room’s patch panel and wall-mounted rack.
- Ocular Dynamic Load Management – Supplied and installed Dynamic Load Control Module For 1-50 chargers (Load management system)
- Wired and installed two Wi-Fi access points in the car park –
Work Timeframe: 2 Weeks
Comments:
Successful EV Infrastructure Installation in Camperdown
McIntosh Electrical recently completed a seamless and future-ready EV charging installation for a 20-unit residential block in Camperdown. This project showcased our commitment to precision, efficiency, and resident-focused service.
Neat and Organised Cabling – A key priority was ensuring meticulously routed and neatly secured cabling. Extensive cable tying and structured pathways enhance the installation’s aesthetics and improve safety, longevity, and ease of maintenance.
Dynamic Load Management – Maximising Efficiency
We integrated Ocular dynamic load management to prevent overloading the building’s electrical infrastructure. This system intelligently distributes power among chargers while monitoring the rest of the building’s power, ensuring optimal performance without costly grid upgrades. It also allows for future expansion as EV adoption grows.
Respecting Residents & Minimising Disruption
Our team worked closely with the strata committee and residents to ensure a smooth installation process with minimal disruption. Careful scheduling, clear communication, and strategic planning meant that work was carried out efficiently and with minimal inconvenience to those living in the building.
This project highlights McIntosh Electrical’s expertise in high-quality EV infrastructure solutions, which combine technical excellence with a deep understanding of residential needs. Looking to upgrade your building with EV charging? We’ve got you covered. (Add Contact Us & Call Now buttons)
EV Charger Product Used: Ocular IQ Wallbox 7.2KW